Glossary.

Terms used across PILLAR, in plain language.

InSAR

Interferometric synthetic aperture radar. Measures millimetre-scale movement from phase differences between radar images taken on different dates.

SAR

Synthetic aperture radar. A satellite sensor that sends its own signal and images the ground at night and through cloud.

Sentinel-1

The Copernicus radar mission. Its data is free and is PILLAR’s default source.

ARIA GUNW

Geocoded unwrapped interferograms from Sentinel-1, published by NASA’s ARIA project.

HyP3

The on-demand SAR processing service of the Alaska Satellite Facility, used when public pairs are scarce.

NISAR

A radar mission built by NASA and the Indian Space Research Organisation.

ERA5

The ECMWF climate reanalysis: temperature, humidity, rain and more.

TimesFM

A time-series forecasting model. PILLAR forecasts displacement six months ahead with a 10–90% band.

Angular distortion

Differential settlement divided by the distance between two points. 1/1000 means 1 mm per metre.

Carbonation

Carbon dioxide lowering the alkalinity of concrete, which can lead to rebar corrosion.

Chloride ingress

Chloride from seawater or de-icing salt moving into concrete, modelled with Fick’s second law.

Cover

The concrete thickness between the rebar and the surface.

Freeze–thaw

Repeated freezing and thawing of water that damages concrete surfaces.

Monte Carlo

Drawing inputs at random many times to get a distribution of results. PILLAR uses 600 draws.

p10 / p50 / p90

The 10%, 50% (median) and 90% points of a result distribution.

SHI

Structural Health Index, PILLAR’s 0–100 screening index.

PSR

Periodic safety review, a nuclear regulatory process that PILLAR does not replace.

ISO 9223/9224

International standards for atmospheric corrosivity classes and metal loss estimates.

Work with us

Start with a screening pilot.

No equipment on site. We screen your structures from public satellite and climate data first, then compare the priority list with your own inspection and survey results.